Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Pусский |
| No.13693959

- Product Categories
- Friendly Links
- home > Supply > Climbing frame Taiyuan, Shanxi Datong climbing frame climbing frame design and construction of technical cooperation Join
Climbing frame Taiyuan, Shanxi Datong climbing frame climbing frame design and construction of technical cooperation Join
Information Name: | Climbing frame Taiyuan, Shanxi Datong climbing frame climbing frame design and construction of technical cooperation Join |
Published: | 2015-04-09 |
Validity: | 30 |
Specifications: | |
Quantity: | 2000.00 |
Price Description: | |
Detailed Product Description: | Liao 宁锦翰 building climbing frame advantage in building construction:? Product appearance adhesive lifting scaffolding erection demolished because only once, so do not take up the limited construction space, thus creating a good job not only for construction start in other processes environment, but also makes the whole construction site clean, beautiful and pretty. ? Affordable attachment lift scaffolding erection in just six and a half-step (floor covering four and a half) to lift with the progress of the project with the layer. The need for a variety of traditional scaffolding erection or continuous erection (six steps each covering four and a half or so) even more to save segmented erection material also needs at least two batches of material repeatedly deal, so the use of scaffolding attached to lifting materials can save 60% the above. After lifting scaffolding attached to the bottom of the main building to the periphery of the disposable erection place without relying on independent automatic lifting crane, crane work so as to reduce the pressure on the crane cycle shortened by a third, significant cost savings. Attached lifting scaffolding erection after completion of a one-time, in the course of just a few people lifting operation, which can save 50% of the workforce. ? Easy to use scaffolding attached to lifting needs erection except once at the bottom, the entire lifting process can only monitor, so the operation is extremely simple; you can lift the whole construction according to the requirements, can be divided into pieces movements; can be repeated many times use. ? Practicality can meet a variety of structural forms of shear walls, frames and other high-rise buildings of the main structure; storey construction to meet operational needs change, change shape, arc, corner, balcony, pick pick along the boards and other complex shapes. ? Safe lifting scaffolding attached to the bottom of the building envelope disposable erection and lifting frame body mainly by the operator inside the building remote implementation, thus overcoming a variety of traditional scaffold erection repeatedly at high altitude defect removal, thorough eradicate the risk of operating personnel working at height. Lifting scaffolding attached to the rail system at a level to make the frame body binding, thereby ensuring a smooth frame body movements and derails shake or overturning. Security anti-adhesion scaffolding fall lifting device ensures rapid failure when hanging device will lock on the main frame body structure. At present, with the pace of China's urbanization, the number of urban high-rise building construction Yulai more application attached lifting construction scaffolding, construction can not only increase efficiency and optimize the site environment, and construction costs than other types of scaffolding fixed budget to save 50% left and right, but also save a lot of manpower, material and shorten the construction schedule, the safety factor is high, very broad application prospects. Attached lifting scaffolding development has already been recognized by the market, and as an advanced construction technology assisted by more and more widely accepted and construction companies in the construction project. |
Admin>>>
You are the 7841 visitor
Copyright © GuangDong ICP No. 10089450, Liao Ning Jinhan Mechanical Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 7841 visitor
Copyright © GuangDong ICP No. 10089450, Liao Ning Jinhan Mechanical Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility